Francesco Pelagi
to
Francesco Pelagi's feed,
Musica allo stato puro
Since the first pour on May 14th 2015, nearly 25,000 wheelbarrow loads of concrete have been hand-poured into the chimneys that each stand 51m tall. Rather than use a hose to pour the concrete, it was decided to replicate the original construction methods and 680 tonnes of concrete was lifted in a hoist to the top of the chimney, transferred into wheelbarrows and then hand poured into the structures. http://www.pce-internatio...
Since the first pour on May 14th 2015, nearly 25,000 wheelbarrow loads of concrete have been hand-poured into the chimneys that each stand 51m tall. Rather than use a hose to pour the concrete, it was decided to replicate the original construction methods and 680 tonnes of concrete was lifted in a hoist to the top of the chimney, transferred into wheelbarrows and then hand poured into the structures. http://www.pce-internatio...

